Renovation of the mayor’s office in Erding town hall
Approximately 4 sqm of Herringbone parquet were removed, the wooden subconstruction was renovated, and new Herringbone was fitted. Six circular intarsia with a checkerboard pattern made of Jatoba and oak were crafted, installed, and finished with an elliptical round frieze. Partial repairs were carried out on oak and Jatoba strips. Subsequently, the surface was sanded and 2-K oiled. Skirting boards 80/16 and 14/14 were painted white and installed as cover strips.




